Glossary

Glossary

13. Bushfire Hazard Assessment Report (Part 1 – Preliminary)

(See Bushfire Hazard Assessment Full Report for further details). If the site is close to the risk it may have a range of BALs (Bushfire Attack Levels) so the consultant will provide rough calculations at the start of the project to assist with design, with the full report being written after the design is finalised. See Bushfire Hazard Assessment Report (Part 2 – Completion).

*The Rubix Collective are accredited Building Designers and are certified and able to provide the same product as a registered architect.

Back to Glossary